South Beaches Chemical and Clarifier Melbourne, FL
Clarifier rehabilitaion consisting of new equipment, metal walkways, and RAS/WAS pumps. Also a new chemical feed station with a new aluminum canopy, chemical containment tanks, and yard piping.
Palm Bay Lime Slurry &
Polymer Feed System
Palm Bay, FL
Demo & replace concrete containment structure, supply lines, and drain lines. Install (2) new 300-gallon lime slurry tanks with float valves & (3) 5-hp hose pumps. Install new polymer blending unit & pumps, a 120-Gallon HDLPE batch tank, and triplex chemical feed skid.
Altamonte Springs WRF Phase I & II
Demolished existing chemical building. Installed new concrete slab and pre-engineered metal building for new chemical building. Two new chemical tanks were installed and two existing chemical tanks were relocated to a new building. Two new skids and chemical piping systems were installed along with emergency eyewash showers.
Mims WTP CO2 Tank Replacement Mims, FL
Replacement of existing CO2 tank with a new CO2 system, including precast electrical building SS piping throughout plant. Related electric & I&C improvements.