Our Special Projects

Central Florida Zoo Bridges Sanford, FL

Three wooden bridges were removed and replaced with new precast concrete bridges at the Central Florida Zoo. This project included the installation of helical anchors to provide structural supports for the new bridges. Concrete sidewalk was formed and poured on both sides of all three bridges. Trex handrail was installed at the Entrance and Log Cabin bridges while fabricated handrail was installed at the Otter Bridge.

Winter Garden Storm Water Capture & Reuse Winter Garden, FL

Site including dewatering and excavation of two storm water ponds. Construction of new headwall and weir structures. Installation of (2) precast lift stations with submersible pumps, piping, and backwash booster pumps. Installation of poured in place floc tank and package filter system. Associated electrical and I&C upgrades.

Central Florida Zoo Otter Exhibit Sanford, FL

Complete sitework package including excavation and final grading, forming and pouring all concrete work associated with the enclosure and viewing areas. Coordination of subs including architectural rock work, viewing windows, plumbing, electrical, and landscaping.

Crane’s Roost Park Bridge Altamonte Springs, FL

Concrete work for the City of Altamonte Cranes Roost Festival Drive Multi Use Trail Bridge. Excavation, forming, reinforcement, concrete placement, and upgraded finish work were involved for footers, columns, pier caps, abutments, gravity walls, and supported slabs of the bridge deck. The complexity was increased by a sloping bridge profile that curved though trees, in an open public venue.